International Journal of Multidisciplinary Futuristic Development  |  ISSN (Print): 3051-3618  |  ISSN (Online): 3051-3626  |  Double-Blind Peer Review  |  Open Access  |  CC BY 4.0

Current Issues
     2026:7/1

International Journal of Multidisciplinary Futuristic Development

ISSN: 3051-3618 (Print) | 3051-3626 (Online) | Open Access

Utilization of Community Land by PT PLN (Persero) Based on Law Number 30 of 2009 Concerning Electricity

Full Text (PDF)

Open Access - Free to Download

Download Full Article (PDF)

Abstract

Study this done for knowing and analyzing How is it? Arrangement utilization land for interest common in Indonesia and how Mechanism Licensing Land Use and Land Granting compensation or change make a loss for the community whose land used by electricity providers. The type of research used is study law Empirical. Results from study This Arrangement utilization land owned by public For procurement network electricity owned by PT.PLN (Persero) according to regulation legislation in Indonesia is regulated in Article 33 Paragraph 3 of the 1945 Constitution, Article 2 Paragraphs 1 and 2 of Law no. 5 of 1960 concerning UUPA, Article 30 of the Law Number 30 of 2009 Concerning Electricity, Articles 15 and 31 of ESDM Regulation No. 13 of 2025 concerning Free Space Network Electric Power Transmission and Compensation for Land, Buildings and/or Plants Located Below Free Space Network Electric Power Transmission. Mechanism licensing utilization land and systems giving compensation or change make a loss for the community whose land is being used For procurement or development network electricity by PT.PLN (Persero) is Calculation magnitude Compensation on land, buildings, and/ or plants that are under the Free Space as intended in Article 12 paragraph (1) letter b is carried out by the Appraisal Agency Compensation Electricity based on agreement Work The same with Network Owner. In implementing calculation magnitude Compensation on land, buildings, and/ or plants located under free space, assessment agency Compensation Electricity must convey plan implementation calculation magnitude Compensation to the Minister. Submission plan implementation calculation magnitude Compensation as referred to in paragraph (2) is carried out online through system information business service support power electricity. Delivery plan implementation calculation magnitude Compensation as referred to in paragraph (3) is completed including BAPT which has registered by the Minister, document agreement Work The same between Network Owners and Assessment Institutions Compensation Electricity, schedule implementation calculation magnitude Compensation and composition team implementation calculation magnitude Compensation.

How to Cite This Article

Lalu Junhairi, Salim HS, Aris Munandar (2026). Utilization of Community Land by PT PLN (Persero) Based on Law Number 30 of 2009 Concerning Electricity . International Journal of Multidisciplinary Futuristic Development (IJMFD), 7(1), 19-29. DOI: https://doi.org/10.54660/IJMFD.2026.7.1.19-29

Export Citation:

BibTeX RIS EndNote

Share This Article: